Producing cable systerm for vehicles

Project:

Introduction of an accounting system from the plant to the level of top management.

Result:

The accounting system was rushed at the plant level (foremen, shift managers, production managers), production performance improved slowly but effectively in all senses (Q, delivery, efficiency). The introduction of the system in the top management level met with resistance, so we achieved only limited results there.